皇冠足球平台开户:Fukushima debris removal delayed by another year

皇冠足球平台开户www.hg108.vip)是皇冠体育官网线上开户平台。皇冠足球平台开户面向亚太地区招募代理,开放皇冠信用网代理申请、皇冠现金网代理会员开户等业务。皇冠足球平台开户可下载皇冠官方APP,皇冠APP包括皇冠体育最新代理登录线路、皇冠体育最新会员登录线路。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠体育规则www.hg9988.vip)是一个开放皇冠网址即时比分、皇冠网址代理最新登录线路、皇冠网址会员最新登录线路、皇冠网址代理APP下载、皇冠网址会员APP下载、皇冠网址线路APP下载、皇冠网址电脑版下载、皇冠网址手机版下载、皇冠体育规则解说的官方平台。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。